Dock Pile Underwater Investigation: Baytown, Texas

CRA recently performed an underwater investigation at a dock on the Houston Ship Channel, which involved mapping existing piling structures underwater to determine safe locations for new batter piles being installed. CRA used a high resolution multi-beam depth sounding system and a mobile LiDAR system above the water to produce an accurate 3D rendition that allowed the engineers to see the current spatial distribution of the piles.

Share on FacebookShare on LinkedInShare on Twitter